性爱无码高清电影|亚洲第一播放器|国产精品日日摸夜夜摸添孕妇|日本在线不卡免费|日韩A片大全在线观看|国产精品Av在线观看|欧美日韩另类一级二级|国产一区二区三区高清无码|成人网站在线观看视频|TS女神第一福利视频


ERG launches Bolashak, its new flagship highly-automated chrome mine in Kazakhstan, and will be gradually ramping it up to full design capacity of 7.5 mln tonnes of ore per annum

  • Wednesday, January 8, 2025
  • Source:ferro-alloys.com

  • Keywords:chrome, chrome ore, iron, steel
[Fellow]Eurasian Resources Group (ERG) has officially launched its Bolashak chromium mine in Khromtau.

[Ferro-Alloys.com] 

ERG launches Bolashak, its new flagship highly-automated chrome mine in Kazakhstan, and will be gradually ramping it up to full design capacity of 7.5 mln tonnes of ore per annum

Eurasian Resources Group (ERG) has officially launched its Bolashak chromium mine in Khromtau.
 
Shukhrat Ibragimov, CEO and Chairman of the Board of Managers of ERG, said: “The launch of the Bolashak mine is a milestone for the metals and mining industry of Kazakhstan.     One of the main investment projects for ERG as a leading ferrochrome producer globally, it’s also among the major initiatives in the ferroalloys industrial sector. “
 
As part of the Bolashak mine, the two deposits are being developed: Millionnoe and Almaz-Zhemchuzhina.     The length of tunnels exceeds 21 km and fully automated lifting machines have a speed of about 16 m/s.     New, high-performance smart drilling rigs with automated operation can be controlled from the surface.
 
  • [Editor:邢亞敏]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!