性爱无码高清电影|亚洲第一播放器|国产精品日日摸夜夜摸添孕妇|日本在线不卡免费|日韩A片大全在线观看|国产精品Av在线观看|欧美日韩另类一级二级|国产一区二区三区高清无码|成人网站在线观看视频|TS女神第一福利视频


Tosyali Algerie to conclude expansion project by 2025, first production in 2024

  • Tuesday, December 26, 2023
  • Source:ferro-alloys.com

  • Keywords:market, mining industry,mine,steel,iron ore,
[Fellow]Algerian steel producer Tosyali Algerie, a subsidiary of Turkish steelmaker Tosyali Holding will conclude the fourth phase, which began in 2022, of its capacity expansion project by 2025

【Ferro-alloys.com】:Algerian steel producer Tosyali Algerie, a subsidiary of Turkish steelmaker Tosyali Holding will conclude the fourth phase, which began in 2022, of its capacity expansion project by 2025, according to an article in the latest quarterly issue of US-based Midrex by Mohammad R.Siddiqui and Saiyad Sajid, representatives from Tosyali Algerie.

The first production in the last phase of the project is scheduled for the second quarter of 2024.

The company will add its site in Bethioua a new direct reduced iron plant, electric arc furnace, hot strip mill, cold strip mill and galvanizing mill. The new DRI plant, EAF and hot strip mill with annual capacities of 2.5 million mt,2.4 million mt and two million mt respectively will be commissioned in 2024, while the cold rolling mill with an annual capacity of 800,000 mt and galvanizing mill with an annual capacity of 400,000 mt will be put into operation in 2025.Technical equipment installations are ongoing.

The DRI plant will produce hot and cold direct reduced iron with the capability to operate with increased percentages of hydrogen in the future. Hot direct reduced iron will be fed to the new EAF melt shop, providing greater electric arc furnace productivity and energy savings.

  • [Editor:Alakay]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!