性爱无码高清电影|亚洲第一播放器|国产精品日日摸夜夜摸添孕妇|日本在线不卡免费|日韩A片大全在线观看|国产精品Av在线观看|欧美日韩另类一级二级|国产一区二区三区高清无码|成人网站在线观看视频|TS女神第一福利视频


Minco Announces Positive Economic Assessment on Woodstock EMM Project

  • Tuesday, July 15, 2014
  • Source:ferro-alloys.com

  • Keywords:Mn metal, Manganese metal, EMM, electrolytic manganese
[Fellow]On July 10, 2014, Minco announced the completion of a positive Preliminary Economic Assessment on its 100% owned Woodstock electrolytic manganese metal(EMM) project

[Ferro-alloys.com]On July 10, 2014, Minco announced the completion of a positive Preliminary Economic Assessment on its 100% owned Woodstock electrolytic manganese metal(EMM) project located 5 km west of the town of Woodstock and the junction of the Trans Canada and I95 Highways in west-central New Brunswick.

The Preliminary Economic Assessment (“PEA”) indicates a pre-tax Net Present Value (“NPV”) of CDN$846 million at a 8% discount rate and a pre-tax Internal Rate of Return (“IRR”) of 17.97%, based on a 3,000 tonne per day (“tpd”) open pit mining, hydrometallurgical and electrowinning operation, with a pre-production capital expenditure of CDN$864 million and average annual payable production of approximately 80,000 tonnes of electrolytic manganese metal.

  • [Editor:Mike.zhang]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!